Equipment: Equipment for heat treatment of wood. Drying and heat treatment chambers (thermomodification) of wood. TMD installation - "Energiya Thermo Stavropol TM20". The price is 4.2 million rubles (22.9.2022). №13341
Sept. 5, 2024, 11:27 a.m.Views: 3345 (stats)
City: Kirov, Kirov region, Russia.
Organization name: show name and reputation
Type: Drying equipment
Equipment name: Equipment for heat treatment of wood. Drying and heat treatment chambers (thermomodification) of wood. TMD installation - "Energiya Thermo Stavropol TM20". The price is 4.2 million rubles (22.9.2022).
Price: 44,271.11 $
Description:
It is intended for drying and subsequent heat treatment of sawn timber from coniferous, soft and hard deciduous wood species without reloading in an oxygen-free environment the combustion products of gaseous fuel (otherwise-the production of thermal wood, thermal strips). It is also possible to carry out only drying or only heat treatment of dry lumber. Warping of the lumber is excluded due to the use of spring ties of the stack.
The payback period of the purchased equipment, provided that it is fully loaded, is no more than six months of continuous operation.
- version-mobile, sea container 40 ft / 12m;
- placement - outdoor;
- complete set-camera, stack trolley, spring ties of the stack - 12 sets for a total force of 5.5 tons, external and folding rail tracks;
- degree of readiness-full factory, boiler room is not required;
- control cabinet - based on a programmable controller with the ability to connect to a PC directly or remotely;
- inner skin material-stainless steel;
- requirements for the site for placement - 24x3 meters;
- requirements for power grids:
- Power supply: 380V; 5.0 kW;
- gas supply - natural gas-G3/4; 30nm3 / h; 1.3 kPa;
- gas supply - liquefied gas-ramp for 10-12 cylinders of 50 liters; 3 kPa;
- start-up period-when the site and power grids are ready - (1-2) days;
- stack:
- overall dimensions and volume: LxWxH= 9, 6x1, 6x1, 7 m; Vgab= 25.5 m3;
- maximum loading volume - for 50 mm board-V50= 18.0 m3 (20 mm spacers);
- maximum loading volume - for a board of 30 mm-V30= 15,5 m3 (gaskets of 20 mm);
- terms of drying and thermal modification (TMD) for a board of 50 mm (for a board of 25 mm-terms are half as long):
- coniferous - drying - (5-7)days, TMD - (2-4) days;
- hard deciduous-drying - (12-15) days, TMD- (2-4) days;
- oak - drying - (20-24) days, TMD - (2-4) days;
- monthly productivity in a board of 50 mm (in a board of 30 mm-1.5 times more):
- drying and subsequent TMD:
- coniferous-72 m3 / month;
- solid deciduous-36 m3 / month;
- oak-26 m3 / month;
- drying only:
- coniferous-90 m3 / month;
- solid deciduous-46 m3 / month;
- oak-30 m3 / month;
- only TMD of dry sawn timber:
- coniferous-130 m3 / month;
- solid deciduous-120 m3 / month;
- oak-110 m3 / month;
- warranty - 12 months.
Post-warranty service-under an additional contract. Maintainability due to the use of domestic equipment is high.
Detailed information is available on the website of " sushkalesa.RF"
Contact details: show contacts
Translated by «Yandex.Translator»